The existing building is a concrete and block work structure where the client wanted to obtain the maximum height whilst moving structural walls. Ultra-beam was ideal for this situation.

RMD Slimshor

Using RMD slimshor because of the high line loads and the 65mm blade, we were able to install structural steel work to the maximum height available.

Our experiences of specifying Ultrabeam on Firecrest were all positive.

CASE STUDIES

SEE WHAT INDUSTRY EXPERTS ARE SAYING ABOUT ULTRABEAM

mansion
“With headroom to be kept to the maximum, UltraBeam 350 was the perfect partnership.”
Mansion Block Structural Engineer
case-studies2
“Our experience of specifying UltraBeam on a project called ‘Firecrest’ were all positive...”
JOHN HARRISON MEng CEng MIstructe
barnet
“A complete opening up of an existing property to make a very large open plan living space”
Barnet Structural Engineer

LATEST NEWS