






Working closely with Harrison Shortt Structural Engineers Ltd over the concept and development of Ultra-Beam a new Prop Head was conceived. We have used Ultra-Beam on many different projects and in many different ways
Design
Ultra-Beam is the first prop head that can be used in Temporary Works Design with a maximum load of 3500kg that can be installed with a single brick removal Ultra-Beam offers structural engineers new possibilities in Temporary Works Design. Using Ultra-Beam with RMD Slimsore Gass Prop and Peri-Multi Prop offers a new dimention to Temporary Works Design
“The new tool in Temporary Works Design ”