Working closely with Harrison Shortt Structural Engineers Ltd over the concept and development of Ultra-Beam a new Prop Head was conceived. We have used Ultra-Beam on many different projects and in many different ways

Design

Ultra-Beam is the first prop head that can be used in Temporary Works Design with a maximum load of 3500kg that can be installed with a single brick removal Ultra-Beam offers structural engineers new possibilities in Temporary Works Design. Using Ultra-Beam with RMD Slimsore Gass Prop and Peri-Multi Prop offers a new dimention to Temporary Works Design

The new tool in Temporary Works Design

CASE STUDIES

SEE WHAT INDUSTRY EXPERTS ARE SAYING ABOUT ULTRABEAM

mansion
“With headroom to be kept to the maximum, UltraBeam 350 was the perfect partnership.”
Mansion Block Structural Engineer
case-studies2
“Our experience of specifying UltraBeam on a project called ‘Firecrest’ were all positive...”
JOHN HARRISON MEng CEng MIstructe
barnet
“A complete opening up of an existing property to make a very large open plan living space”
Barnet Structural Engineer

LATEST NEWS

FOLLOW US ON TWITTER, INSTAGRAM AND FACEBOOK